FacebookPixel

AZUAGA 68

Upon request 
The project consists of two buildings, the northern building called Azuaga 68 and the southern building called Ernesto 65, with construction work starting in July 2024.

The Azuaga 68 building consists of 10 units, 4 T0, 4 T1 and 2 T2.
The building will be built with a medium to high standard finish.

The apartments will have: kitchen with Margrés ceramic flooring or similar, Silestone compact quartz countertops, living rooms and bedrooms with oak flooring and walls covered in painted plasterboard; bathroom covered in Margrés ceramic or similar. The bathrooms will all be high quality suspended.

All apartments will be delivered with all Siemens appliances and Midea air conditioning. Water heating system with heat pump. The energy certification will be level A.

​Both buildings have an elevator and the access ramp to the garage will be via Rua Ernesto Silva.
Ver mais +
Pretendo ser contactado
Date
Hora
Name
Contact
Message
Privacy Policy
captcha
Code

Empreendimentos

Descubra a nossa oferta

VESS LIVING
VESS LIVING
Braga, Guimarães
T1 to T4 since
215 000 €
HILCROWN
HILCROWN
Porto, Vila Nova de Gaia
T3 to T4 since
549 780 €
Estamos disponíveis para o ajudar Pretendo ser contactado
Date
Hora
Name
Contact
Message
captcha
Code
O que é a pesquisa responsável
Esta pesquisa permite obter resultados mais ajustados à sua disponibilidade financeira.