FacebookPixel
Send property to a friend
Know more »
captcha
Required fields *
AZUAGA 68 - T1 since 270 000 €
The project consists of two buildings, the northern building called Azuaga 68 and the southern building called Ernesto 65, with construction work starting in July 2024.

The Azuaga 68 building consists of 10 units, 4 T0, 4 T1 and 2 T2.
The building will be built with a medium to high standard finish.

The apartments will have: kitchen with Margrés ceramic flooring or similar, Silestone compact quartz countertops, living rooms and bedrooms with oak flooring and walls covered in painted plasterboard; bathroom covered in Margrés ceramic or similar. The bathrooms will all be high quality suspended.

All apartments will be delivered with all Siemens appliances and Midea air conditioning. Water heating system with heat pump. The energy certification will be level A.

​Both buildings have an elevator and the access ramp to the garage will be via Rua Ernesto Silva.
Pretendo ser contactado
Date
Hora
Name
Contact
Message
Privacy Policy
captcha
Code
fractions
Reference Property Type Fraction Floor Typology WCs Garage Total Area Condition Price Availability Plans
1308 Flat M 202 2 T1 1 1 78,3 Under Construction 270 000 € Available
1307 Flat N 203 2 T1 1 1 114,2 Under Construction 360 000 € Available
Other developments
Estamos disponíveis para o ajudar Pretendo ser contactado
Date
Hora
Name
Contact
Message
captcha
Code
O que é a pesquisa responsável
Esta pesquisa permite obter resultados mais ajustados à sua disponibilidade financeira.